Welcome to AsiaBizTech Web Site

 
Top Page
Site Map
News at a Glance Member Services AsiaBizTech Resources



Advanced Search


(Nikkei BP Group)



(No.1 High-Tech News Site in Japanese)

















  • NEC Starts Full-Scale Operations at PDP Plant
  • December 10, 1998 (TOKYO) -- NEC Corp. said it is at full-scale operations at its new plant for color plasma display panels (PDPs).
    The factory had been under construction on the premises of NEC Kagoshima since October 1996.

    According to NEC, the new plant is the world's first mass production plant that can deal with two 42-in. panels at a time. It can also produce a large-size panel of 60 inches, the company claimed.

    It is now producing 3,000 panels per month, calculated in terms of 42-in. panels. NEC plans to increase the panels to 10,000 panels per month by March 1999 and to 30,000 panels per month within fiscal 1999.

    Hiroshi Shiba, NEC's senior vice president, said the current yield rate is 70 percent.

    The plant is a large, two-story building measuring 275m x 65m x 25m. Its total floor space is 32,000m2, of which 5,500m2 is for a clean room. The invested amount is 25 billion yen (US$209 million).

    NEC dissolved its Color PDP Business Promotion Division into a new Color PDP Division as of Dec. 9 in order to develop the business full scale at the plant.

    Related story: NEC Wins Japan Patent to Drive Plasma Display Panels

    (Nikkei Microdevices)



    <Visit News Center for more Asian news.>



    Copyright © 1997-98
    Nikkei BP BizTech, Inc.
    All Rights Reserved.
    Updated: Wed Dec 9 12:43:44 1998 PDT